It's a tough task — sacrifice some rest time, and don't let failure cost you time and money. The Motorola Solutions Design Point (PTP and PMP) Solutions test braindump at TestBraindump: 114 practice questions for the MSC-111 exam.
Motorola Solutions MSC-111 Exam Overview:
| Certification Vendor: | Motorola Solutions |
|---|---|
| Exam Name: | Design Point (PTP and PMP) Solutions |
| Exam Number: | MSC-111 |
| Related Certifications: | Motorola Solutions Wireless Broadband Certification |
| Available Languages: | English |
| Exam Format: | Multiple Choice |
| Exam Price: | $300 USD |
| Real Exam Qty: | 60-114 |
| Certificate Validity Period: | 3 years |
| Passing Score: | 70% |
| Exam Duration: | 90 minutes |
| Recommended Training: | Motorola Solutions Official Training |
| Exam Registration: | Motorola Solutions Certification Portal Pearson VUE Registration |
| Sample Questions: | ![]() |
| Exam Way: | Online proctored or onsite at Pearson VUE test centers |
| Pre Condition: | Recommended 2+ years of wireless networking experience; no mandatory prerequisite exams |
| Official Syllabus URL: | https://www.motorolasolutions.com/en_us/services/certification.html |
Motorola Solutions MSC-111 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Site Survey and Implementation | 5% | - Grounding and environmental considerations - Site requirements and antenna placement |
| PMP System Design | 30% | - Sector planning and capacity design - PMP 100/400 series architecture - Authentication and encryption - Access Point and Subscriber Module deployment |
| Network and Service Integration | 15% | - VLAN, QoS and IP routing - Security and management |
| Wireless Broadband Fundamentals | 20% | - Line-of-sight and propagation - RF principles and spectrum
|
| PTP System Design | 30% | - FTP and PTP product portfolio - Link planning and path analysis - Frequency selection and interference mitigation - Timing and synchronization |
Motorola Solutions Design Point (PTP and PMP) Solutions Exam FAQ — A New Start
Yes:
After any course, reinforce it with the 114 practice questions for the Motorola Solutions Design Point (PTP and PMP) Solutions — every answer expert-verified.
The Motorola Solutions Design Point (PTP and PMP) Solutions blueprint spans 5 domains — including PMP System Design (30%), Network and Service Integration (15%), Wireless Broadband Fundamentals (20%). Know your strength and shortcoming per domain; the complete outline above lists every subtopic.
90 minutes for 60-114 questions. The TestBraindump test engine simulates the actual test's atmosphere, so you get used to real conditions in advance.
Yes — download the free trial of the Motorola Solutions Design Point (PTP and PMP) Solutions study materials before you buy and judge the profession and accuracy yourself. Purchases include 365 days of free updates, sent automatically and immediately by email; renew afterward at 50% off.
$300 USD per attempt, 70% to pass. A failed attempt is a loss of time and money — prepare steadily with the 114 practice questions for the MSC-111 exam at TestBraindump.
Through the vendor's official registration channels:
The Motorola Solutions Design Point (PTP and PMP) Solutions is delivered Online proctored or onsite at Pearson VUE test centers — pick the arrangement that suits you when booking.
The Motorola Solutions Design Point (PTP and PMP) Solutions is Motorola Solutions's certification exam for Design Point (PTP and PMP) Solutions Certification, at the Professional level. Passing it is a new start — toward better salary, decent work, and promotion chances. Related credentials include Motorola Solutions Wireless Broadband Certification.
Recommended 2+ years of wireless networking experience; no mandatory prerequisite exams Eligibility rules change over time, so verify the current requirements on the official page (official MSC-111 exam page) before registering.
Upon successful payment, our system emails the Motorola Solutions Design Point (PTP and PMP) Solutions test braindump automatically within about a minute — credit card payment accepted, with 24/7 help if nothing arrives within 2 hours. If you fail the corresponding MSC-111 exam within 60 days of purchase, scan your exam transcripts and email them as attachments within 2 days of the exam — together with a scanned enrollment slip and the official Score Report PDF — and after confirmation we refund the full amount within 7 days. Excluded: exams within 3 days of purchase, candidate names that don't match the payer, and free or expired products. Or exchange for two equal-value products free.
Motorola Solutions Design Point (PTP and PMP) Solutions Sample Questions:
In a layer 2 Ethernet ring topology, what protocol is the most crucial to implementing a bop free network?
- A. DHCP - Dynamic Host Control Protocol
- B. CSMA/CD - Carrier Sense Multiple Access with Collision Detection
- C. NDP - Neighbor Discovery Protocol
- D. STP - Spanning Tree Protocol
- E. LACP - Link Aggregation Control Protocol
Correct Answer: D 🗳️
If high priority is enabled for 50 SMs, how many additional SMs without high priority enabled can be supported on the same AP?
- A. 50
- B. 150
- C. 100
- D. 250
- E. 200
- F. 300
Correct Answer: C 🗳️
Understanding a region's RF regulatory standards is important for planning deployment scalability for which of the following reasons (select TWO)?
- A. Radio output power restrictions effecting coverage areas
- B. Maximum number of SM's that can be deployed in a given area
- C. Type of data that can be transmitted on the network
- D. Maximum throughput allowed over a PMP system
- E. Availability of frequency bands that can be used in the region
Correct Answer: A,E 🗳️
The amount of MAC addresses to Ethernet Port mappings in a switch is finite. What happens when the available mappings in these lookup tables are exhausted?
- A. The switch floods traffic for all MAC addresses that do not have a lookup entry out of all its ports
- B. The switch sends a congestion notification out the port to throttle the traffic until the lookup tables have available entries
- C. The switch caches all traffic destined for the MAC addresses that are not in the lookup tables until entries become available
- D. The switch drops all traffic destined for MAC addresses that are not in the lookup tables
Correct Answer: A 🗳️
A customer requires a low throughput, low latency (< 2 ms) wireless solution to connect 3 remote buildings to the main office. All remote buildings are under 2 km's away and within
120 degrees of the main office. What solution would be best suited for this customer?
- A. Motorola PMP Access Point with 120 degree antenna at main office with (3) CPE units at the remote buildings
- B. Motorola PMP CPE operating in bridge mode, connected in a chain. (Main Office to remote Building A, A to B, B to C)
- C. Motorola PMP Access Points with 60 degree antennas at main office with (3) CPE units at the remote buildings
- D. Motorola FTP600 backhaul links from the main office connected to the remote buildings
Correct Answer: D 🗳️


