Download the Latest RCDD Dumps - 2022 RCDD Exam Questions [Q190-Q211] | TestBraindump

Download the Latest RCDD Dumps - 2022 RCDD Exam Questions [Q190-Q211]

Share

Download the Latest RCDD Dumps - 2022 RCDD Exam Questions

Latest BICSI RCDD Certification Practice Test Questions


BICSI RCDD Exam Syllabus Topics:

TopicDetails
Topic 1
  • Designing Telecommunications Distribution Systems
Topic 2
  • Telecommunications Distribution Methods Manual (TDMM).
Topic 3
  • Foundations of Designing Telecommunications Distribution Systems

 

NEW QUESTION 190
Which of the following is a nonmechanical firestop system?

  • A. Factory fabricated sleeve system
  • B. Cable transit system
  • C. Firestop blocks
  • D. Fire rated pathway device

Answer: C

 

NEW QUESTION 191
Exhibit:

The figure below represents what type of chart?

  • A. Gantt
  • B. Milestone
  • C. PERT
  • D. Calendar
  • E. Status

Answer: B

Explanation:
Topic 14, Private CATV Distribution Systems

 

NEW QUESTION 192
The propagation and path loss of radio signals in the target environment can be sampled using:

  • A. Radio power meters
  • B. Directional antenna
  • C. Mesh antennas
  • D. Propagation software

Answer: A

 

NEW QUESTION 193
The public telephone system is an example of a __________ system.

  • A. Half-duplex
  • B. Simplex
  • C. Purely analog
  • D. Full-duplex
  • E. Purely digital

Answer: D

 

NEW QUESTION 194
Cables are installed in a ceiling in a straight line. The ceiling run is 60 m (200 ft) in length. What is the MINIMUM number of J-hooks required to support the cables?

  • A. 0
  • B. 1
  • C. 2
  • D. 3
  • E. 4

Answer: A

 

NEW QUESTION 195
The MINIMUM finished height of access flooring in a general office area is:

  • A. 150 mm (6 in)
  • B. 200 mm (8 in)
  • C. 300 mm (12 in)
  • D. 250 mm (10 in)
  • E. 50 mm (2 in)

Answer: B

 

NEW QUESTION 196
What type of optical fiber is used primarily for outside plant (OSP) applications?

  • A. Breakout style
  • B. Duplex zip cord
  • C. Loose-tube
  • D. Ribbon
  • E. Tight-buffer

Answer: C

 

NEW QUESTION 197
In a home run conduit system, a single horizontal cable can serve up to three outlet boxes.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 198
If the usable floor space is unknown, then deduct ________ percent of the total area available to estimate the usable area.

  • A. Twenty
  • B. Twenty five
  • C. Fifteen
  • D. Ten
  • E. Five

Answer: A

 

NEW QUESTION 199
Color codes for cross-connections fields have been used for many years. Which color is used to identify campus backbone?

  • A. White
  • B. Green
  • C. Blue
  • D. Purple
  • E. Brown

Answer: E

 

NEW QUESTION 200
When a building is not on the property line, the building owner should provide a MINIMUM of ________ conduits from a point inside the building, to the property line or easement for entrance facilities.

  • A. Three
  • B. Four
  • C. Two
  • D. Five

Answer: C

 

NEW QUESTION 201
When designing a connection to an outlying building you decide to choose a physical ring. Your primary reason for considering a physical ring is:

  • A. The design is quick and easy to install
  • B. The design is cost effective
  • C. You have easy access to an existing pathway
  • D. The campus suits this design
  • E. The physical ring provides a redundant cable path for disaster recovery

Answer: E

 

NEW QUESTION 202
Which of the following are general power requirements for all TRs?

  • A. Place outlets at 6 ft intervals around perimeter walls.
  • B. Convenience outlets should be identified and marked.
  • C. At least one outlet should be switched.
  • D. Install a separate 120 volt duplex convenience outlet for tools and test sets etc.
  • E. Install a minimum of two dedicated non-switched 3-wire 120 volt 20 amp duplex outlets.
  • F. Distribution panels that serve telecommunications equipment should be the same that serve lighting fixtures.

Answer: A,B,D,E

 

NEW QUESTION 203
The signal at the input to a balanced twisted pair cable is 10 mW. The cable is 1000 feet long and has an attenuation of 1 dB per 100 feet. This cable is connected to the input of a receiver. The noise level at the input to the receiver is 1 microwatt. What is the signal-to-noise ratio (SNR) (dB) at the receiver input?

  • A. 60 dB
  • B. 30 dB
  • C. 40 dB
  • D. 10 dB
  • E. 100 dB

Answer: B

 

NEW QUESTION 204
A building has a series of CATV outlets each with cables installed back to a telecommunications room (TR), and each telecommunications room (TR) is connected to the headend. What is this type of topology called?

  • A. Star
  • B. Bus
  • C. Mesh
  • D. Series

Answer: A

 

NEW QUESTION 205
A vertical conduit mast should not extend above a roof line more than which of the following?

  • A. 4 inches
  • B. 12 inches
  • C. 24 inches
  • D. 6 inches

Answer: A

 

NEW QUESTION 206
An outside plant (OSP) cable must be placed under a pipeline with two side by side pipe runs. The distance between the outside pipes is 6 m (20 ft). What is the length of the conduit required to facilitate the pipeline crossing?

  • A. 9 m (30 ft)
  • B. 7.6 m (25 ft)
  • C. 12 m (40 ft)
  • D. 10.7 m (35 ft)
  • E. 6 m (20 ft)

Answer: C

 

NEW QUESTION 207
A conduit run is installed from the ER to a TR. It has two (2) 90 degree bend and a length of 20 m (65 ft). What will be the MINIMUM test rating of the pull cord left in the conduit?

  • A. 40 kg (88 lb)
  • B. 90 kg (200 lb)
  • C. 20 kg (44 lb)
  • D. 60 kg (132 lb)
  • E. 100 kg (220 lb)

Answer: B

 

NEW QUESTION 208
You have just finished a design calling for 15 telecommunications outlets. You received word that the owner has increased his requirements by 40%. What size commercial DD (distribution device) is required to accommodate the increase?

  • A. 1015 mm (40 in)
  • B. 1346 mm (53 in)
  • C. 660 mm (26 in)
  • D. 1676 mm (66 in)

Answer: B

 

NEW QUESTION 209
Exhibit:

In this future marina layout, what would be the pre-cabling guideline to follow for the terminal A?

  • A. Provide one or two pair cables from the boat slips to a distribution terminal on the closest point of land.
  • B. For security, each run should be terminated in the patch panel/ cross-connect at the dockmaster or marina office.
  • C. Pre-cable each boat slip during construction.
  • D. Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Run
    service drop to each boat slip.

Answer: D

 

NEW QUESTION 210
Which area of project management covers the blending of various subteams into a project organization with a cohesive plan?

  • A. Integration management
  • B. Communications management
  • C. Human resources management
  • D. Risk management

Answer: A

 

NEW QUESTION 211
......

Verified RCDD Dumps Q&As - 1 Year Free & Quickly Updates: https://www.testbraindump.com/RCDD-exam-prep.html