
Updated Oct 24, 2021 Verified E-S4HCON2022 dumps Q&As - 100% Pass
New 2021 Latest Questions E-S4HCON2022 Dumps - Use Updated SAP Exam
SAP E-S4HCON2022 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| SAP S/4HANA Conversion Prepare Phase > 12% | Describe and perform the actions necessary during the SAP S/4HANA conversion prepare phase |
| SUM Prepare Part > 12% | Perform the SUM prepare part |
| Modification Adjustment 8% - 12% | Perform the modification adjustment with SPDD and SPAU |
| Handling of an SAP System Landscape 8% - 12% | Describe the handling of the SAP system landscape during SAP S/4HANA conversion and SAP system upgrade |
| Manual Activities for SUM 8% - 12% | Describe the necessary manual preparation and follow-on activities for SUM |
| SUM Monitoring and Troubleshooting 8% - 12% | Monitor and troubleshoot the SUM procedure |
| Downtime 8% - 12% | Describe the factors influencing downtime and techniques to reduce downtime |
| SUM Execution Part > 12% | Perform the SUM execution part, including DMO |
E-S4HCON2022 Exam Certification Details:
| Cut Score: | 65% |
| Level: | Specialist |
| Exam: | 40 questions |
| Sample Questions: | SAP E-S4HCON2022 Exam Sample Question |
| Duration: | 90 mins |
| Languages: | English |
NEW QUESTION 20
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:
- A. It performs a comparison on all tables using row counts.
- B. It does NOT perform any table comparison.
- C. It performs a comparison on selected tables using check sum.
- D. It performs a comparison of all tables using check sum.
Answer: A
NEW QUESTION 21
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?
- A. The link to different patch levels to SUM
- B. AA
- C. An overview about possible upgrade paths
- D. The corrections to the SUM Guide
Answer: A,C,D
NEW QUESTION 22
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.
- A. During downtime
- B. During SPDD
- C. Post-downtime
- D. During uptime
Answer: C,D
NEW QUESTION 23
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
- A. Uptime migration (EU_CLONE_MIG_UT_RUN)
- B. Shadow repository creation (EU_IMPORT*)
- C. Downtime migration (EU_CLONE_MIG_DT_RUN)
- D. ParaUel distribution (PARDIST_SHD)
Answer: A
NEW QUESTION 24
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Install add-on SAP Gateway 7.50
- B. Uninstall industry extensions not supported by SAP S/4HANA
- C. Uninstall Fiori apps not released for SAP_UI 7.50
- D. Delete client 066 (Early Watch Client)
Answer: C,D
NEW QUESTION 25
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:
- A. Execution of SPDD modification adjustment
- B. Execution of SPAU modification adjustment
- C. Execution of XPRAs and AIMs
- D. Creation of the table structures in the new SAP HANA database
- E. Execution of eCATTs for business validation tests
Answer: B,C,E
NEW QUESTION 26
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
- A. Kernel for target release, Linux, SAP HANA
- B. Kernel for target release, Windows, SAP MaxDB
- C. Kernel for target release, Windows, SAP HANA
- D. Kernel for source release, Windows, SAP MaxDB
Answer: C,D
NEW QUESTION 27
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:
- A. In the job log for the corresponding job in SM37 (Job Overview)
- B. In the corresponding R3trans log files of this phase
- C. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
- D. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
Answer: A,C
NEW QUESTION 28
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:
- A. Import of upgrade and language data from the download directory in phase TABIM UPG
- B. Activation of dictionary objects in phase ACT_UPG
- C. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
- D. Import of dictionary objects from the download directory in phase DDIC_UPG
- E. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
Answer: A,B,D
NEW QUESTION 29
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?
- A. The repetition option allows you to repeat the complete migration
- B. The repetition option allows you to run the migration without a shadow system
- C. The benchmaking option allows you to repeat the uptime migration
- D. The benchmaking option allows you to migration a specified set of tables
Answer: D
NEW QUESTION 30
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:
- A. To auto-fill specific fields on selected screens on the SUM UI
- B. To repeat specific phases during the SUM run
- C. To make the progress information within SUM UI more accurate
- D. To skip selected phases during the SUM run
Answer: C
NEW QUESTION 31
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:
- A. In Process Control Center
- B. In SUM Parameters
- C. In DMO Migration Preparation
- D. In SUM Phaselist
Answer: A,B
NEW QUESTION 32
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:
- A. Check the system log (transaction SM21) of the SAP system
- B. Check the most recent entries in SAPup.log
- C. Check the messages shown by the SUM UI
- D. Check the most recent entries shown in file sapevt.trc
Answer: B,C
NEW QUESTION 33
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
- A. A
- B. DMO can only be run with systems NW740 or NW731
- C. Target DB size will increase temporarily
Answer: B,C
NEW QUESTION 34
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:
- A. Dedicated application tables are migrated in uptime
- B. TABIMJJPG is executed in uptime
- C. An additional temporary database is used during uptime
- D. The repository is migrated in uptime
Answer: A
NEW QUESTION 35
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:
- A. Parameter file SAPup_add.par
- B. MIGRATE J5T_DUR_XML file from a previous run
- C. Stack XML file calculated by the Maintenance Planner
- D. Breakpoint configuration file SAPUPPHAS.BRK
Answer: B,C
NEW QUESTION 36
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:
- A. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
- B. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
- C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
- D. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
Answer: D
NEW QUESTION 37
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:
- A. Phase DOWNCONF_DTTRANS
- B. Phases DIFF*
- C. Phases EU_IMPORT*
- D. Phase RUN_RSPTBFIL _ISUTABU
- E. Phase RUN_RSDBSCPY
Answer: A,B,C
NEW QUESTION 38
......
Latest E-S4HCON2022 Exam Dumps SAP Exam from Training: https://www.testbraindump.com/E-S4HCON2022-exam-prep.html
Pass SAP E-S4HCON2022 PDF Dumps Recently Updated 55 Questions: https://drive.google.com/open?id=1pL_wpMK2TiRqkvPR8DtiH8unEtQei4B7
